Urbanization

Projects
Photos

Construction works for the redesign and redevelopment of Calatalifa Avenue in Villaviciosa de Odón

 The works included a complete redesign of the area, including reinstallation of water, gas and electricity facilities, new pavement in pedestrian and vehicle areas, green area development, lighting and a playground.

Client

Ayuntamiento de Villaviciosa de Odón (Madrid)
Madrid

Construction Dates

24 Oct 2006-26 Dec 2006 (Completed)

Urban Development of the area "Madraza", in Granada

The development of the area consisted of demolishing the existing roads, pavements, lightning system, sewage system and clean water, high and low voltage, gas, telephone and optic fibre.

The next stage was to divert utilities and replace them where necessary.

Main roads, high and low voltage, sewage systems, gas, lighting installation, drinking water system, etc.

Green areas were also constructed.

 

Client

Empresa Pública de Suelo de Andalucía (EPSA)
Granada

Construction Dates

25 Jan 2007-07 Oct 2010 (Completed)